|
The Auburn Trail is almost entirely sheltered on either side by trees as it meanders through residential and commercial areas. Running along the same former rail corridor as the Auburn Trail...
|
NY |
2 mi |
Crushed Stone
|
|
|
Brickyard Trail offers a pleasant north-south route through the Town of Brighton, which sits on the southeastern outskirts of Rochester. Its name is a nod to the town's brickmaking industry dating...
|
NY |
0.8 mi |
Crushed Stone
|
|
|
Overview
The Cayuga-Seneca Canalway Trail is a 4.5-mile pathway beginning in Waterloo, New York, and terminating at Seneca Lake State Park.
About the Route
The roadbed it uses was constructed...
|
NY |
4.5 mi |
Crushed Stone, Dirt, Grass
|
|
|
Overview
Two former rival railroad corridors that crossed in Buffalo’s eastern suburbs now form a 20.5-mile paved trail system called Clarence Pathways in Clarence, Newstead, and Akron.
About...
|
NY |
20.5 mi |
Asphalt
|
|
|
Closure Notices: In Palmyra/Wayne County, a portion of the trail is closed between route 21 and Swift Landing Park. In Oneida-Verona, Oneida County, a bridge replacement is taking place at the corner...
|
NY |
335.2 mi |
Asphalt, Concrete, Crushed Stone
|
|
|
By the early 1800s, Rochester had earned the nickname of Flour City because of its numerous mills that allowed the young town to rapidly become the largest flour producer in the United States. The...
|
NY |
22.8 mi |
Asphalt, Concrete
|
|
|
Snaking along the shoreline of Lake Ontario, the Irondequoit Lakeside Multi-Use Trail provides a smooth journey infused with the region’s rich natural and cultural heritage. The nearly 7-mile trail...
|
NY |
6.9 mi |
Asphalt, Boardwalk, Concrete
|
|
|
Overview
The Keuka Outlet Trail offers a winding route of 6.7 miles between Penn Yan and Dresden in New York’s Finger Lakes region. The rail trail follows a railroad corridor that traces a former...
|
NY |
6.7 mi |
Asphalt, Ballast, Dirt, Gravel
|
|
|
The Manchester Gateway Trail is a scenic route used by walkers and cyclers that follows the Canandaigua Outlet through Manchester. It has also been used for skiing during winter months. The trailhead...
|
NY |
1.5 mi |
Asphalt, Crushed Stone
|
|
|
The El Camino: Butterhole-Seneca Park Trail (often more simply called the El Camino Trail) runs diagonally through a neighborhood and industrial properties in northeast Rochester on an abandoned CSX...
|
NY |
2.3 mi |
Crushed Stone
|
|
|
The Ellicott Trail is a crushed stone rail-trail in Batavia, Genesee County. The trail provides the best of both worlds, winding through the heart of downtown while also providing an immersive journey...
|
NY |
4.7 mi |
Crushed Stone
|
|
|
The Erie Attica Trail lies in the Finger Lakes region of New York along the former railroad for which it's named. A glimpse of this past can be seen in the beautiful truss bridge that spans 220 feet...
|
NY |
1.3 mi |
Boardwalk, Crushed Stone
|
|
|
The I-390 Bike Path is a 5-mile paved trail starting in Greece and ending at the Island Cottage Woods Preserves just south of Lake Ontario. The trail starts just after crossing Route 104 using the...
|
NY |
5.3 mi |
Asphalt
|
|
|
Travelers on the Lake Ontario State Parkway Trail will enjoy scenic views of wooded areas, surrounding bodies of water and wetlands. The trail parallels the north side of the Parkway, which runs along...
|
NY |
3.3 mi |
Asphalt, Concrete
|
|
|
The North Branch of the Lehigh Valley Trail connects the campuses of the University of Rochester and Rochester Institute of Technology. The trail’s northern terminus is where the Erie Canal Heritage...
|
NY |
14.5 mi |
Asphalt, Crushed Stone
|
|
|
The Pittsford Trail System, also called the Railroad Loop Trail, provides access to the Erie Canal, town of Pittsford, and shopping and business district in the quaint New York village. A short...
|
NY |
5.1 mi |
Asphalt, Concrete, Crushed Stone
|
|
|
The West Shore Trail sits on the former West Shore Railroad corridor, whose tracks and ties were pulled up in the 1960s. Aside from about 1300 ft in Churchville which is paved, the trail surface is...
|
NY |
9 mi |
Asphalt, Crushed Stone
|
|